Cleaning & Degreasing
- —Remove all dust, dirt, oil, and contaminants
- —Use appropriate degreasers for chemical residues
- —Sweep and vacuum thoroughly before proceeding
- —Allow surface to dry completely after cleaning
ICR Solution
Professional Installation
Complete guide for proper installation of ICR Solution flooring systems. Follow these steps to ensure optimal performance and longevity.
General guidance only. Before installation, confirm every value and procedure in the current TDS, SDS and written specification for the exact product.
Step 01
Step 02
Mixing
Application
Preparation
Installation
Timing
Final Application
These values are general guidance. The current Technical Data Sheet (TDS) and Safety Data Sheet (SDS) for the exact product always take priority.
Step 03
Step 04
Speak directly with our local technical team for assistance with installation questions.
Send questions, photos or project specifications for written technical guidance.
Use the current installation manual, Technical Data Sheet and Safety Data Sheet for every product.
For complex or critical installations, our specialists can assist with planning and on-site supervision.
Improve your team's practical knowledge through focused product and installation training.